Production Test Reports
Customers have the ability to view detailed notes from test procedures as they are being completed. These notes contain the following information.
1 | INTRODUCTION |
1.1 | Purpose |
1.2 | Scope |
2 | PERSPECTIVE |
2.1 | System Functional Overview |
2.2 | System Mission |
3 | TEST OVERVIEW |
3.1 | Test Goals |
3.2 | Successful Test Completion |
3.3 | Test Equipment Requirements |
4 | PREPARATION FOR TESTING |
4.1 | Physical Inspection Prior To Testing |
4.2 | SCR Gate Wiring Check |
5 | HI-POTENTIAL TEST |
5.1 | Preparation |
5.2 | Dielectric Voltage Withstand Test |
6 | POWER SUPPLY REDUNDANCY CHECKS |
6.1 | Power Supply Distribution Checks |
6.2 | Source and Output Bus Checks |
6.3 | Source 1 Checks |
6.4 | Source 2 Checks |
6.5 | Output Checks |
7 | PRELIMINARY OPERATION CHECK AND SET-UP |
7.1 | Unit Setup |
7.2 | Basic Unit Operation |
8 | NORMAL OPERATION NO LOAD TESTS |
8.1 |
CAUTIONARY NOTE |
8.2 | Source Loss and Return Transfers |
8.2.1 | Source 1 Loss and Return Transfer from Source 2 |
8.2.2 | Source 2 Loss and Return Transfer from Source 1 |
8.2.3 |
Source 1 Loss and Return Transfer from Source 3 |
8.2.4 | Source 3 Loss and Return Transfer from Source 1 |
8.2.5 | Source 2 Loss and Return Transfer from Source 3 |
8.2.6 | Source 3 Loss and Return Transfer from Source 2 |
8.3 | Inhibit Set Points Page Out-of-Phase Transfer Inhibit and Out-of-Phase Transfer Test |
8.3.1 | Source 1 Out-of-Phase Transfers |
8.3.1.1 | Source 1 Out-of-Phase Transfer Inhibit |
8.3.1.2 | Source 1 to Source 2 Out-of-Phase Transfer |
8.3.2 | Source 2 Out-of-Phase Transfers |
8.3.2.1 | Source 2 Out-of-Phase Transfer Inhibit |
8.3.2.2 | Source 2 to Source 1 Out-of-Phase Transfer |
8.3.3 | Source 3 Out-of-Phase Transfers |
8.3.3.1 | Source 3 Out-of-Phase Transfer Inhibit |
8.3.3.2 | Source 1 to Source 3 Out-of-Phase Transfer |
8.3.3.3 | Source 3 to Source 1 Out-of-Phase Transfer |
8.3.3.4 | Source 2 to Source 3 Out-of-Phase Transfer |
8.3.3.5 | Source 3 to Source 2 Out-of-Phase Transfer |
8.4 |
Operations Page Source Under-Voltage and Over-Voltage Transfers |
8.4.1 | Source 1 |
8.4.2 | Source 2 |
8.4.3 | Source 3 |
8.5 | Source Re-Acquisition and Transfer Set Points Page Re-Transfer Time Delay Operation |
8.5.1 |
Source 1 Fast Source Re-Acquisition |
8.5.2 |
Source 2 Fast Source Re-Acquisition |
8.5.3 | Source 3 Fast Source Re-Acquisition |
8.6 | Shorted SCR Test |
8.6.1 | Source 1 Test |
8.6.2 | Source 2 Test |
8.6.3 | Source 3 Test |
9 | ALARM, STATUS, CONTROLS TEST, AND BYPASS |
9.1 | Customer Status Contacts |
9.2 | Customer Control Contacts |
9.3 | Mimic Page Check |
9.4 | Alarm/Status Page Checks |
9.5 | Remote TCP/IP Connection |
9.6 | Voice Prompt Load Bypass Procedure Check |
9.6.1 | Test Set-up |
9.6.2 | Bypass to Source 1 |
9.6.3 | Bypass to Source 2 |
10 | LOAD TESTS |
10.1 | Meters Page Check |
10.2 | SCR Forward Drop |
10.3 | Open SCR Test |
10.3.1 | Source 1 Open SCR Test |
10.3.2 | Source 2 Open SCR Test |
10.3.3 | Source 3 Open SCR Test |
10.4 | Operations Page Preferred Source Select Transfer Check |
10.5 | Operations Page Overload Transfer Inhibit Test |
10.5.1 | Overload Transfer Inhibit Test Set-up |
10.5.2 | Source 1 Overload Transfer Inhibit Test |
10.5.3 | Source 2 Overload Transfer Inhibit Test |
10.5.4 |
Source 3 Overload Transfer Inhibit Test |
10.5.5 | Unit Reset To Nominal |
11 | BURN-IN TEST |
11. | Static Transfer Switch Configuration |
21. | I-Line Panel Board Configuration |